D1.1  Detailed implementation plan
download PDF 
02.05.2015
D1.2  Interim periodic report Y1download PDF 12.03.2015
D1.3 Interim periodic report Y2download PDF 26.10.2015
D1.4 Interim periodic report Y3download PDF  08.04.2016 
D2.1.1  Current Status Assessment & Scenario outlines (draft 1)
download PDF
03.02.2014
D2.1.3  Current Status Assessment and scenario outlines (final)download PDF  29.01.2017
D2.1.2  Current Status Assessment & Scenario outlines (draft 2)
download PDF
07.11.2014
D2.2.1  Draft security requirements
download PDF 
11.03.2015
D2.2.2  Candidate security requirements
download PDF
01.08.2014
D2.2.3 Final security requirementsdownload PDF  12.07.2016 
D2.3.1  End-user requirements document draft
download PDF 
25.02.2015
D2.3.2  End-user requirements document candidate release 
download PDF
07.11.2014
D2.3.3  End-user requirements document final releasedownload PDF 29.01.2017
D2.4.1 System subsystem design description (SSDD) candidate release 
download PDF
08.09.2014
D2.4.2 System subsystem design description final release download PDF 
12.07.2016
D2.4.3  Network architecture candidate release
download PDF
08.09.2014
D2.4.4 Network architecture final release download PDF 10.01.2017 
D3.1.1 PPDR Framework standard model and template agreementsdownload PDF  29.02.2016 
D3.1.2 Norway-Sweden agreementdownload PDF  20.10.2016 
D3.2.1 Functional model download PDF  17.03.2016 
D3.3.1 Handbook of PPDR proceduresdownload PDF  13.07.2016 
D3.4.1 Procedures for new entrants to the ISITEP network download PDF  26.01.2017
D4.1.1 ISI Over IP public specificationdownload PDF 
04.03.2016 
D4.1.2a Gateway prototype Motorola network
D4.1.2b Gateway prototype SELEX ES network
download PDF 
download PDF  
28.01.2016
26.10.2015
D4.1.3 Procedures for interoperability testing and prototypes test reportdownload PDF 14.07.2016
D4.1.4a Gateway prototype Motorola network final releasedownload PDF  17.05.2016 
D4.1.4b Gateway prototype SELEX Es network final release
download PDF 
 19.01.2017
D4.2.1  E1 ISI TETRA gateway interface design documentation
download PDF 
15.12.2014
D4.2.2 Prototypes for the demonstrationsdownload PDF  26.10.2015
D4.2.3 Prototypes for the demonstrations final release download PDF 
17.05.2016 
D4.3.1  Requirements for TETRA-TETRAPOL interoperability
download PDF 
25.02.2015
D4.3.2  TETRA-TETRAPOL gateway interfaces design
download PDF
11.11.2014
D4.4.1  Requirements for TETRAPOL-TETRAPOL Interoperability
download PDF
28.02.2014
D4.4.2  TETRAPOL-TETRAPOL gateway Interfaces design
download PDF
30.06.2014
D4.4.3 Interface- gateway prototypedownload PDF 
01.12.2015
D4.4.4 Prototype test report  download PDF  09.01.2017
D4.4.5 Interface gateway prototype final releasedownload PDF  09.01.201 
D4.5.1  Requirements for mobile gateway
download PDF
30.06.2014
D4.5.2 Deployable Gateway design capabilitiesdownload PDF  22.06.2015
D4.5.3 Deployable gateway prototypedownload PDF 
01.12.2015
D4.5.4 Prototype test reportdownload PDF 09.01.2017
D4.5.5 Deployable gateway prototype final release  download PDF  09.01.2017 
D4.6.1 Analysis of potential security frameworks and solutionsRESTRICTED11.03.2015
D4.6.2 Security architecture to support demonstration casesRESTRICTED
20.10.2015
D4.6.3 Security solutionRESTRICTED29.06.2016 
D4.7.1 Gateways Integration and test planRESTRICTED
03.09.2015
D4.7.2 Factory test report on gateway and network elements integrationRESTRICTED
02.11.2015
D4.7.3 Integration and test plan for network interconnectionsRESTRICTED
02.11.2015
D4.7.4 Test report of integration and testing of network interconnectionsRESTRICTED 07.10.2016 
D4.8.1 Procedures for testing interoperabilityand test reportsRESTRICTED  01.02.2017
D5.1.1 Enhanced terminal requirements
download PDF
09.06.2014
D5.1.2 Terminal open architecture and functions public specificationsdownload PDF  05.10.2016 
D5.2.1 Adaptation/communication manager test reportdownload PDF 
21.03.2016
D5.2.2 Adaptation/communication manager design description
download PDF  
09.10.2015
D5.2.3 Adaptation/communication manager software download PDF  08.06.2016 
D5.3.1 Security manager test reportdownload PDF  28.04.2016 
D5.3.2 Security manager design description
download PDF  
23.10.2015
D5.3.3 Security manager  softwaredownload PDF  07.06.2016 
D5.4.1 Workflow manager test reportdownload PDF  11.04.2016 
D5.4.2 Workflow manager design descriptiondownload PDF  
03.11.2015
D5.4.3 Workflow manager  softwaredownload PDF  07.06.2016 
D5.5.1 Semantic/syntactic translator database populationdownload PDF 
04.02.2016
D5.5.2 Semantic/syntactic translator test reportdownload PDF 
10.06.2016 
D5.5.3 Semantic/syntactic translator engine design descriptiondownload PDF 
04.02.2016
D5.5.4 Semantic/syntactic translator softwaredownload PDF  10.06.2016 
D5.6.1 User interface and business logic manager test resultsdownload PDF  06.06.2016 
D5.6.2 User interface and business logic manager design descriptiondownload PDF  22.10.2015
D5.6.3 User interface and business logic manager engine softwaredownload PDF  08.06.2016 
D5.7.1 Enhanced terminal test reportRESTRICTED18.01.2017 
D5.8.1 Open public procedures of multi vendor interoperability of enhanced terminalsdownload PDF 
15.07.2016 
D5.8.2 Enhanced terminal validation and qualification reportRESTRICTED 25.01.2017
D6.1.1 Open public functional specificationsdownload PDF 
26.01.2016
D6.1.2 Network dimensioning sub-tooldownload PDF 
21.04.2016 
D6.1.3 Logistic tooldownload PDF 
19.03.2016
D6.1.4 Infrastructures dimensioning tooldownload PDF 
13.04.2016 
D6.2.1 Open public functional specificationsdownload PDF 
31.03.2016
D6.2.2 Terminal training tooldownload PDF 
10.06.2016 
D6.2.3 Operations training tooldownload PDF 
06.06.2016
D6.3.1 European cross-border collaboration surveydownload PDF 
19.03.2016
D6.4.1 PPDR terminal applications test reportdownload PDF  08.06.2016 
D6.4.2 PPDR terminal applications design descriptiondownload PDF  03.11.2015
D6.4.3 PPDR terminal applications softwaredownload PDF  08.06.2016 
D6.5.2 PPDR server applications design descriptiondownload PDF 
08.10.2015
D7.1.1 Demonstrator plan and requirementsdownload PDF 
04.02.2016
D7.1.2 Demonstrator activities design download PDF  29.02.2016 
D7.1.3 Demonstrator test results first run download PDF  09.01.2017 
D7.1.4 Demonstrator test results finaldownload PDF  09.01.2017 
D7.1.5 Demonstrator final reportdownload PDF  09.01.2017 
D7.2.1 Demonstrator plan, requirementsdownload PDF 
05.10.2015
D7.2.2 Demonstrator activities design download PDF 20.11.2016
D7.2.3b Demonstrator test results (update with 2nd run results)download PDF  20.11.2016
D7.3.1 Demonstrator plan and requirementsdownload PDF 
06.10.2015
D7.4.1 Demonstrator plan and requirementsdownload PDF 
16.01.2017
D7.4.3  Demonstrator test results first rundownload PDF  16.01.2017 
D7.4.4  Demonstrator test results finaldownload PDF  16.01.2017 
D7.5.1 Demonstrator plan and requirementsdownload PDF  06.10.2015
D7.5.2 Demonstrator activities design download PDF  26.1.2017
D7.5.3-7.5.4 Demonstrator test resultsdownload PDF  26.01.2017
D7.5.5 Demonstrator final report download PDF  29.01.2017 
D7.6.1-2-3 Joint assessment report, public version download PDF   02.02.2017
D8.1.1  Dissemination plan
download PDF 
29.01.2016
D8.1.2 Final dissemination reportdownload PDF   23.01.2017
D8.1.3  Report on establishment and activities of a dissemination committee download PDF 
01.03.2016
D8.2.1  Project logo design
download PDF
16.12.2013
D8.2.2  Project fact sheet 
download PDF
14.02.2014
D8.2.3  Project presentation 
download PDF
12.02.2014
D8.2.4  Brochures 
download PDF
01.10.2014
D8.2.5  Posters
download PDF
download PDF
02.05.2014
D8.2.6  News and newsletters download PDF
31.10.2014
D8.2.7 Website
download PDF
03.02.2014
D8.3.1  Preliminary "Who is Who?" (enriched database)
download PDF 
25.02.2015
D8.3.3 Report on 1st ISITEP workshopdownload PDF 
04.02.2016
D8.3.4 Report on 2nd ISITEP workshopdownload PDF 
04.02.2016
D8.3.6  Report of 4th ISITEP final eventdownload PDF  18.01.2017 
D8.3.7 Report on external eventsdownload PDF   23.01.2017
D8.4.1 Exploitation reportdownload PDF  12.07.2016 
D8.5.1 Detailed report on the ethical, legal and societal aspects of the project
download PDF 21.09.2015
D8.5.2 First Report On Security, Integrity and availability
download PDF
07.11.2014
D8.5.3 Second detailed report on security, integrity and availability
download PDF  
06.10.2015
D8.5.4 Final report on the ethical, legal and societal aspects of the project download PDF  31.01.2017 
D8.5.5 Final report on security, integrity and availability download PDF  16.01.2017